EV charging hubs.
Most visits to an EV charging hub are by drivers already on the road. We show the real effect on the network and design an access and layout that suit charging behaviour.
Main guide: Transport for drive-thrus and roadside uses
Charging hubs are often proposed beside main roads, sometimes with a cafe or shop. The highway authority will look at the access, the effect on the main road and how the site works when chargers are busy.
What the council focuses on
The safety of the access onto a busy road, whether trips are new or already passing, queuing when chargers are full, the layout for different vehicle sizes, and the effect of any ancillary food or retail.
The evidence that answers it
- Trip generation separating new, pass-by and diverted trips.
- Dwell times and charger occupancy.
- Access design and visibility onto the main road.
- Swept paths, including vans and vehicles with trailers.
Hubs with food and retail
A cafe or shop changes how long people stay and how the site is serviced. We assess the combined use so the evidence reflects what will actually happen.
What the application usually needs
- A Transport Statement covering new, pass-by and diverted trips.
- A charger occupancy and queuing assessment.
- Access design for cars, vans and, where proposed, HGVs.
- Swept paths for all vehicle types, including towing.
- Assessment of any cafe, shop or drive-thru on site.
A typical case
A typical case is a 16-bay rapid charging hub beside a busy A road, with a coffee shop. The highway authority asks whether queuing will spill onto the road and how many new trips there will be. We show that most visitors are already passing, that occupancy rarely reaches capacity, and that waiting space on site prevents queuing at the access. Our insight on how many EV hub trips are new sets out the method.
Technical points
Charging hubs have short dwell times for rapid charging, so turnover is high but the total of new trips is modest. Bays should be sized for larger EVs and vans, with drive-through bays where towing is expected. Grid connection equipment such as substations needs maintenance access. For HGV charging, we design for articulated vehicles and check the approach roads.
If highways raise concerns
Common concerns are queuing onto the road, the safety of the access and the number of new trips. Evidence of charger occupancy, pass-by trips and on-site waiting space usually resolves them.
On trunk roads, National Highways applies its own standards. Our Tore appeal summary shows how an EV hub was assessed in Scotland.
How we help
We provide the transport statement, access design and layout checks for charging hubs of all sizes.
The same questions arise in Scotland and Wales, where they are assessed against NPF4 and Scottish guidance or Planning Policy Wales and TAN 18 rather than the NPPF.
To get a quote, send us:
- The site address or a location plan.
- The number and type of chargers and any ancillary uses.
- The access and any existing use of the site.
- Any pre-application advice or highways comments you already have.
Questions we get asked
Does an EV charging hub need a Transport Statement?
Usually, especially beside main roads or with a cafe or shop. Small sites may need a short access note.
How many new trips does an EV hub generate?
Fewer than the total visits, because most drivers are already passing. See our insight.
Will queuing affect the main road?
We assess charger occupancy and provide waiting space so vehicles do not queue at the access.
Can a hub include HGV charging?
Yes, with access, bays and swept paths designed for articulated vehicles.
Do you assess drive-thrus with charging hubs?
Yes. The combined use is assessed together. See our drive-thru page.
Related guidance.
EV charging hubs: how many trips are really new?
Read
Drive-thrus and roadside uses
Read
Petrol filling stations
Read
Related services: Transport Statements · Site access design · Swept path analysis.
Guidance and sources
- GOV.UK: National Planning Policy FrameworkEngland. National policy on transport in planning decisions.
- GOV.UK: Travel Plans, Transport Assessments and StatementsEngland. Planning guidance on proportionate transport evidence.
Sources checked 8 November 2026. General information, not advice on a specific site.
Got a site in mind?
Send us the location and what is proposed. We will tell you what the council is likely to ask for, with a fixed fee.