Transport Statements.
A proportionate transport report for small and medium schemes: access, parking, trips and how people will walk, cycle and catch the bus. Sized to the scheme, with a fixed fee.
Before commissioning the evidence, our transport scoping service can define the study area, assumptions and tasks. Where EIA is relevant, we can coordinate screening input, ES scoping and the transport chapter with the environmental team.
What’s included.
A Transport Statement suits schemes where the transport effects are modest but the council still needs evidence. For some small sites a short technical note is enough. We tell you which, and agree it with the highway authority first.
- Site description and existing conditions
- Access, visibility and swept path drawings
- Car and cycle parking against local standards
- Walking, wheeling, cycling and bus access
- Trip generation using TRICS
- Collision data review
- Servicing, refuse and emergency access
- A Travel Plan statement where asked for
Straightforward, proportionate, agreed early.
Proportionate
NPPF policy TR6 asks for evidence proportionate to the scheme. We write what the officer needs, and no more.
Plain English
Short, clear reports your client, the case officer and the committee can all follow.
Fast turnaround
Where surveys are not needed, a Transport Statement can often be turned round in two to four weeks.
Does your scheme need a Transport Statement?
The report should follow the transport issues, not a dwelling count in isolation. A small scheme can need careful evidence where the access is constrained, parking is disputed or nearby roads are sensitive. A larger scheme in a well connected location may raise different questions.
We review the proposal, the council’s validation requirements and any highway comments before recommending a technical note, Statement or Transport Assessment. The difference between a Statement and an Assessment is the depth of evidence needed, not simply the length of the document.
What to send us
- A location plan and the proposed use, number of homes or floor area.
- The current layout, including parking and the access, if one exists.
- Any pre application advice or highway consultation response.
- Your submission date and any existing transport reports or surveys.
An early sketch is enough for an initial scope. We will identify which drawings, observations or surveys are needed before confirming the commission.
What the commission should make clear
The agreed scope sets out the report, supporting drawings and data to be provided, together with assumptions about the layout and any officer discussions. It should also say whether responses to consultation comments are included, and how changes to the scheme will be handled.
For budgeting, see what affects the cost of a Transport Statement. Surveys, additional design work and a separate Travel Plan should be identified in the quote rather than assumed to be part of every Statement.
Guidance checked 18 October 2026. National transport policy for England · Planning guidance on transport evidence.
Highways reports and transport reports
A Transport Statement is often described as a highways report, transport report, traffic statement or highways statement. Councils may also ask for a "highways technical note" on smaller schemes. Whatever the name, the council wants to know how the site will be reached safely, how many trips it will generate, and how it connects to walking, cycling and public transport. As transport and highways consultants, we prepare each of these at the right level for the scheme. See do I need a Transport Statement.
Questions we get asked
Is there a fixed threshold for a Transport Statement?
There is no single national dwelling threshold that determines the answer for every site. Check the council’s current validation requirements and the significance of the transport issues. Older indicative thresholds are a starting point, not an automatic exemption.
Can a technical note do instead?
Often, for small schemes with a simple access. We will ask the council and tell you honestly.
Do I need traffic surveys?
Not always. Published data and site observation are often enough for a Statement. Where surveys help, we tell you why before you pay for them.
Often needed alongside.
Last reviewed October 2026 by Ripple Development Planning. Policy and guidance change; for advice on a specific site, send us the details.
From our insights.
The next questions to resolve
Need help with Transport Statements?
Send us the location and what's proposed. We'll tell you what it needs, with a fixed fee.
Help with the next decision.
Transport Statements for changes of use
Transport and parking advice for shops, clinics, gyms, offices and other changes of use, including customer trips, deliveries and highways comments.
Transport planning for commercial yards and open storage
Access, HGV movements, parking and servicing advice for commercial yards, open storage sites and small industrial premises.
Equestrian and rural access transport advice
Access and transport advice for stables, riding schools and rural leisure sites, including horseboxes, trailers, parking and narrow lanes.
Transport advice for changes to approved schemes
Transport reviews for revised layouts, parking changes, increased occupancy and amended operating hours on approved developments.
Discharging highways planning conditions
Transport reports, layout checks and management plans to address highways conditions attached to planning permission.
Transport feasibility before buying a site
Access and transport feasibility advice for private buyers, landowners and small developers before committing to a plot or design.
Swept path analysis and vehicle tracking
Vehicle tracking for driveways, small housing layouts, commercial yards and servicing, using the vehicles relevant to your scheme.
Transport and parking advice for nurseries and schools
Transport Statements, parking and pick up arrangements for nurseries, school extensions and changes in pupil or staff numbers.
Get the right evidence.
Traffic surveys and transport data
Survey specification, commissioning and data checks for planning applications, transport modelling and environmental assessments.
Automatic traffic counts and ATC surveys
ATC survey specification and commissioning for classified traffic flows, daily patterns and speed data where the site and equipment are suitable.
Junction turning counts and queue surveys
Classified turning counts and queue survey briefs for junction modelling, planning applications and access assessments.
Pedestrian and cycle surveys
Walking, cycling and crossing movement surveys to inform access design, sustainable travel and development transport assessments.
Journey time and origin and destination surveys
Survey scoping for travel times, route choice and origin and destination studies, including specialist ANPR collection where appropriate.
Traffic data for noise and air quality assessments
Traffic survey and forecasting inputs for acoustic and air quality consultants, with consistent links, vehicle classes and assessment scenarios.
Traffic speed surveys for access and visibility
Speed survey specification and commissioning to inform access visibility and highway design, with data checked for the relevant approach conditions.
Start with your site’s location
The relevant council guidance and evidence requirements depend on where the site is. Find transport planning advice for your area for local authority contacts and our area guides.