Access, visibility and swept path checks.
Check the access and layout work on transport grounds before you submit, so the highways officer does not have to ask.
Three steps, no wasted effort.
Send the layout
A red line and a sketch or draft layout is enough to start.
We check it
Visibility, access width, parking and vehicle tracking, against the council’s standards.
You get drawings
Clear visibility and swept path drawings, with any changes needed marked up.
- Visibility splays, based on measured speeds where it helps
- New driveways, vehicle crossovers and dropped kerbs
- Access width and junction layout
- Bin lorry, fire engine and delivery tracking
- Car and cycle parking numbers and layout
- Turning heads and private drives
- Footways and crossing points
Check the space you need and the land it uses
A visibility line on a drawing is only part of the answer. The access needs to work with the road’s geometry, traffic speeds, footways, parking and expected users. The land needed to build and maintain it also needs checking.
- The access position, width, gradients and available visibility.
- The basis for the visibility distances and whether measured speeds are needed.
- The highway boundary and any land outside the applicant’s control.
- Walking and cycling routes across and alongside the access.
- Turning and servicing using a vehicle agreed for the proposed use.
Choose the guidance for the road and its context
Manual for Streets, local authority guidance and DMRB have different purposes and scopes. DMRB applies to motorways and all purpose trunk roads and may also be required by a local highway authority for a particular road. A higher speed alone does not decide which guidance applies.
A speed survey can inform the assessment, but a lower recorded speed does not automatically justify a shorter visibility splay. We check the survey method, road context and the authority’s requirements before recommending a design.
What you receive and what may follow
The agreed commission can include a marked up layout, visibility drawing, swept path plots and a short explanation of the assumptions and changes needed. An access accepted at planning stage may still need detailed technical approval, a highway agreement or separate land arrangements before it can be built.
For a developed access design, see site access design. Our explainers cover how visibility splays are measured, visibility across land outside your control and using vehicle tracking during design.
Guidance checked 18 October 2026. Manual for Streets · Design Manual for Roads and Bridges.
Questions we get asked
Can a speed survey reduce the visibility we need?
It can inform the assessment. Whether a shorter splay is justified depends on the survey, road context, applicable guidance and the highway authority’s requirements.
Do you work from our CAD layout?
Yes. Send the layout and we will produce drawings to match it.
Is this enough on its own for planning?
For some small schemes, a short note with these drawings is all the council needs. We will tell you if yours needs more.
What the checks cover
Three questions decide most access reviews: can drivers see and be seen, can the vehicles that need to get in turn round safely, and does the layout work for people walking and wheeling.
Visibility depends on the road context, relevant guidance and an appropriate assessment of traffic speeds. Vehicle tracking tests how refuse, fire and delivery vehicles move through the site. The design vehicle and operating assumptions should be agreed for the proposed use.
- Visibility splays drawn from measured or posted speeds, with the land they cross checked against the highway boundary.
- Tracking for the largest vehicle that will use the site, agreed with the council where it has its own standard.
- Footway links, crossing points and gradients, so the access works for everyone.
Last reviewed October 2026 by Ripple Development Planning. Policy and guidance change; for advice on a specific site, send us the details.
From our insights.
Send us your layout.
We'll read it and come back to you with what it needs and a fixed fee.
Start with your site’s location
The relevant council guidance and evidence requirements depend on where the site is. Find transport planning advice for your area for local authority contacts and our area guides.