The theory behind it
Important
This calculator is a guide based on national guidance. It does not replace professional judgement, the highway authority’s standards or a site survey. Ripple Development Planning accepts no responsibility or liability for any reliance placed on it, including for calculating visibility or designing an access. The designer remains fully responsible for their own calculations, assumptions and design, and for confirming requirements with the highway authority.
Which standard applies.
Manual for Streets 2 applies to most streets and local roads. At 60 km/h (37 mph) and below, it uses a 1.5 second reaction time and a deceleration of 0.45g for cars. Above 60 km/h, it uses a 2 second reaction time, with 0.25g for the desirable minimum and 0.375g for the absolute minimum (MfS2 Table 10.1).
DMRB applies to trunk roads and is often used by highway authorities for high-speed rural roads. CD 109 sets stopping sight distances by design speed, and CD 123 sets the x-distance at junctions. If you are not sure which the authority will expect, run both and ask at pre-application stage.
When survey speeds help.
The speed limit is a starting point, not the speed drivers actually travel at. For existing streets, MfS2 10.1.4 uses the 85th percentile wet-weather speed. Where recorded speeds are lower than the limit, a survey can support a shorter splay that fits within land you control, subject to the survey method, the road context and the authority’s requirements. Where they are higher, expect the authority to ask for the longer splay.
A week-long automatic traffic count gives speeds in both directions, along with the share of HGVs and buses.
Keeping the splay clear.
The splay needs to stay free of anything that would block a driver’s view, typically above about 0.6 m, for as long as the access is in use. It should fall within the public highway or land the applicant controls. A splay across a neighbour’s land is difficult to secure, and appeals have been dismissed on that point.
Appeal decisions and guidance.
How inspectors, the courts and highway authorities have dealt with speed evidence, standards, land control and forward visibility.
Nottinghamshire visibility splay guidance, June 2026 update
Read
Appeal decisionSpeed evidence and an access refused against advice: the Rose Farm appeal
Read
Appeal decisionDMRB visibility on the A120 and costs against National Highways
Read
Appeal decisionVisibility between road users on a narrow lane: the Charlton Horethorne appeal
Read
High CourtTrees, third-party land and a visibility splay: the Kayte Lane challenge
Read
Appeal decision, WalesA visibility splay you cannot control
Read
Splay won't fit?
Survey speeds, a different access position or a justified relaxation can often resolve it. Send us the site and we'll tell you what it needs.