Travel Plans.
Practical Travel Plans that satisfy the condition and actually work: realistic targets, measures people use, and monitoring the council can sign off.
Also known as: Travel Plan, Full Travel Plan, Travel Plan Statement, workplace Travel Plan, residential Travel Plan
What’s included.
NPPF policy TR6 expects a Travel Plan alongside a Transport Statement or Assessment for schemes that generate significant movement. A full Travel Plan is for a known occupier or a single-phase scheme. Where occupiers are not yet known, a Framework Travel Plan usually comes first.
- Baseline travel and site accessibility
- Targets the council and occupier can live with
- Measures that suit the site and its users
- A named Travel Plan coordinator role
- Monitoring and review arrangements
- Travel Plan statements for smaller schemes
- Discharge of Travel Plan conditions
- Monitoring surveys and annual reports
Straightforward, proportionate, agreed early.
Realistic, not aspirational
Targets based on the site and its users, so the occupier can actually meet them.
Measures that get used
Cycle parking where people want it, travel information that is current, and incentives with real take-up.
Light-touch monitoring
A monitoring plan that gives the council what it needs without burying the occupier in paperwork.
What the application usually needs
- A baseline of the site’s accessibility by walking, cycling and public transport.
- Mode share targets suited to the site and its users.
- Measures such as cycle parking, travel information and car club access.
- A Travel Plan coordinator role.
- A monitoring plan with surveys and reporting.
A typical case
A typical case is a 150-home housing scheme where the council requires a Framework Travel Plan. We set baseline mode shares from census data, propose targets for reducing car trips, and include welcome packs, cycle parking, bus taster tickets and a coordinator funded by the developer. Monitoring surveys follow a standard method, with annual reports to the council for an agreed period.
Standards and method
Travel Plans vary by scheme: a short Travel Plan Statement for smaller developments, a Framework Travel Plan for multi-occupier or phased sites, and a full Travel Plan for a known occupier. Monitoring often uses standard survey methods, such as the TRICS Standard Assessment Methodology, so results can be compared over time.
Schools often use Modeshift STARS for their own travel planning. Workplace plans can include car sharing, flexible working and parking management.
Questions we get asked
What is the difference between a full and a Framework Travel Plan?
A full Travel Plan is written for a known occupier and sets specific measures and targets. A Framework Travel Plan sets the approach for a site where occupiers are not yet known, and each occupier then produces its own plan.
Do councils charge for Travel Plan monitoring?
Many do, usually secured through a Section 106 agreement. We check the local fee early so it is in your appraisal.
Can you discharge an existing Travel Plan condition?
Yes. Send us the decision notice and we will prepare what the condition asks for.
What is a Travel Plan Statement?
A shorter Travel Plan for smaller schemes, setting out measures without detailed targets or monitoring.
How long does Travel Plan monitoring last?
It varies by council and scheme, often several years after occupation.
Who is the Travel Plan coordinator?
A named person or organisation responsible for delivering the plan, often funded by the developer or occupier.
Do you prepare school Travel Plans?
Yes, for new schools and expansions, often linked to Modeshift STARS.
Often needed alongside.
Last reviewed October 2026 by Ripple Development Planning. Policy and guidance change; for advice on a specific site, send us the details.
From our insights.
Need help with Travel Plans?
Send us the location and what's proposed. We'll tell you what it needs, with a fixed fee.
The parking case, made clearly.
For HMOs, conversions and homes with limited parking, we assess demand, test the layout and address the questions raised by the council.
HMOs and conversions
Parking demand, usable spaces within the site and responses to highways objections.
HMO transport advice
Parking stress surveys
Representative surveys and a clear assessment of additional demand on surrounding streets.
Survey scope and reporting
Car free and low car homes
Accessibility evidence, reduced parking and practical measures that can be delivered.
Low car development advice