Transport Assessments.

A full assessment of how a larger scheme affects travel, safety and the road network, scoped with the council so it answers their questions and nothing more.

Illustration of a development site in its neighbourhood with five and ten minute walking catchments, reaching a corner shop, bus stops, a park, a primary school and the high street
What officers want to see first: how people will walk, cycle and catch the bus from the site.

Before commissioning the evidence, our transport scoping service can define the study area, assumptions and tasks. Where EIA is relevant, we can coordinate screening input, ES scoping and the transport chapter with the environmental team.

What we do

What’s included.

A Transport Assessment is usually needed for larger schemes, or smaller ones near busy junctions or with a poor safety record. Under NPPF policy TR6, the evidence must be proportionate to the scale of the scheme. We agree the scope with the highway authority before any surveys are bought.

  • A scoping note agreed with the highway authority
  • Site access design, visibility and swept paths
  • Walking, wheeling, cycling and public transport review
  • Trip generation, distribution and traffic growth
  • Junction capacity modelling where needed
  • Collision analysis and road safety review
  • Mitigation that leaves the area better, not just acceptable
  • A Travel Plan to go with it
How we approach it

Straightforward, proportionate, agreed early.

Scope first

We agree the study area, junctions, survey dates and assumptions in writing, so you do not pay for work nobody asked for.

Built around the tests

Every chapter leads back to the two questions in policy: is highway safety acceptable, and is any residual effect on the network severe?

Give something back

Where a footway, crossing or bus improvement helps the scheme and its neighbours, we design it in and make sure officers see it.

Scoping

Agree the questions before commissioning the surveys

The study area should follow the likely effects of the development. We consider the proposed uses, travel choices, junctions, relevant peak periods, nearby committed development and the concerns already raised by the highway authority. National Highways may also need to be involved where the strategic road network is affected.

  • The development schedule and the transport vision for the site.
  • The study area, assessment years and reasonable future scenarios.
  • Walking, wheeling, cycling and public transport opportunities.
  • Trip generation, distribution and the treatment of existing uses.
  • Survey requirements, modelling assumptions and mitigation to test.
Design and evidence

An Assessment should inform the layout

Access, parking, servicing and routes to nearby facilities should develop alongside the assessment. Finding an issue while the layout can still change is more useful than reporting it after the application drawings are complete.

For schemes in England, NPPF policy TR6 asks for proportionate evidence, consideration of reasonable future scenarios and a Travel Plan where significant movement is expected. Scotland and Wales have separate policy frameworks, which need to be checked for the site.

Commissioning

What to include in the brief

Send the site boundary, development schedule, access options, existing reports, authority comments and the intended planning programme. We will identify the evidence to commission, the likely points for officer agreement and the dependencies that could affect delivery.

For a more modest scheme, a Transport Statement may be proportionate. If the immediate question is whether the site is worth pursuing, start with transport feasibility before purchase.

Also searched as

Traffic impact assessments and Transport Assessments

A Transport Assessment is sometimes called a traffic impact assessment (TIA), traffic assessment or highways impact assessment. In England, Wales and Scotland the planning system uses the terms Transport Assessment and Transport Statement, but the content is what matters: trip generation, the effect on junctions and safety, accessibility by walking, cycling and public transport, and any mitigation. See also junction modelling and trip generation and TRICS.

FAQ

Questions we get asked

When do I need a Transport Assessment rather than a Statement?

It depends on the scale of the scheme, local thresholds and how sensitive the nearby roads are. Many councils still start from the Department for Transport’s 2007 indicative thresholds. We will tell you which applies, and confirm it with the council.

How long does a Transport Assessment take?

Typically six to twelve weeks, mostly driven by survey timing and modelling. We give you a programme with the fixed fee.

Do you include junction modelling?

Yes, using Junctions (ARCADY and PICADY) and LinSig, but only for the junctions the scheme genuinely affects.

Related

Often needed alongside.

Transport planning A to Z

Last reviewed October 2026 by Ripple Development Planning. Policy and guidance change; for advice on a specific site, send us the details.

Further reading

From our insights.

All insights
Related advice

The next questions to resolve

Need help with Transport Assessments?

Send us the location and what's proposed. We'll tell you what it needs, with a fixed fee.

Local requirements

Start with your site’s location

The relevant council guidance and evidence requirements depend on where the site is. Find transport planning advice for your area for local authority contacts and our area guides.