How much does a Transport Statement cost?
What drives the cost and timescale of transport evidence for planning, and how to avoid paying for more than the council needs.
What’s included.
The cost of transport evidence depends far more on what the council will ask for than on the size of the report. A short technical note for a small scheme costs a fraction of a full Transport Assessment with surveys and modelling. The most effective way to control cost is to agree the scope with the highway authority first.
- Scale and type of the scheme
- Whether a note, Statement or Assessment is needed
- Traffic, speed or parking surveys
- Junction modelling
- Off-site works and Road Safety Audits
- Travel Plan requirements
Straightforward, proportionate, agreed early.
Fixed fees
A clear, fixed price for the scope the council actually needs, usually within two working days of receiving your site details.
Scope agreed first
An agreed written scope makes assumptions and exclusions clear. Further authority requests or changes to the scheme can still require additional work.
Programme with the fee
Timescales set out with the quote, including any survey dates that drive them.
Compare the scope as carefully as the fee
Two quotes for a Transport Statement can cover different work. One might use a supplied layout and existing survey data. Another might include a site visit, speed surveys, access drawings and a response to the first highway consultation. The report title alone will not tell you whether the prices are comparable.
- Report preparation: the development and transport issues covered.
- Drawings: whether access design, visibility and vehicle tracking are included.
- Data: survey collection, purchased data and any limits on reusing older surveys.
- Consultation: the meetings or rounds of responses allowed for.
- Commercial terms: VAT, expenses, exclusions and the basis for additional work.
What can change the cost or delivery date?
Survey availability, suitable survey conditions, changes to the layout and the extent of junction analysis can affect both fee and programme. Agree the evidence before commissioning surveys. A date for issuing our report is different from the time the council takes to respond.
A scheme that needs a new junction design or substantial modelling should be scoped around those tasks. It should not be priced as a simple Statement and then expanded without a clear discussion.
How to get a meaningful fixed fee
Send the site location, proposal, latest layout, council comments and your target submission date. We can then distinguish the Transport Statement service from a full Transport Assessment or a focused access note.
The quotation should identify the work included, the information needed from your team, survey or third party costs and the allowance for revisions. Additional work should be agreed before it starts.
Guidance checked 18 October 2026. Planning guidance on transport evidence.
Questions we get asked
How much does a Transport Statement cost?
It depends on the scheme, whether surveys are needed and what the council will ask for. Send us the site and we will give you a fixed fee, usually within two working days.
How long does a Transport Statement take?
Often two to four weeks without surveys. Surveys and modelling add time, mostly because of when counts can be done.
Why do quotes vary so much?
Usually because of different assumptions about scope. Agreeing the scope with the council first is the best way to compare like with like.
Often needed alongside.
Last reviewed October 2026 by Ripple Development Planning. Policy and guidance change; for advice on a specific site, send us the details.
From our insights.
Need help with fees and timescales?
Send us the location and what's proposed. We'll tell you what it needs, with a fixed fee.