InsightsAppeal decisions · 6 min read

Relative, not universal: accessibility in a Welsh appeal.

Steep hills, narrow pavements and a missing footway did not stop 43 homes at Llanfairfechan. How Planning Policy Wales and TAN 18 frame accessibility.

Ripple Development PlanningPublished

Appeal decision: · Allowed · Reference CAS-04497-C7C2W2

The council said the site was too steep, too far and too badly served by footways to be a sustainable place for 43 homes. The inspector agreed the walk would be hard for some people, then allowed the appeal. Welsh policy, the decision explains, asks for the most accessible location reasonably available, not for a route that suits everyone.

The case: 11 Gorwel, Llanfairfechan, Conwy County Borough

Proposal: Outline, 43 dwellings including 13 affordable, with access formed by demolishing 11 Gorwel, plus open space and pedestrian connections

Inspector: N Jones, appointed by the Welsh Ministers (Planning and Environment Decisions Wales)

Decision: Allowed after a hearing, 27 April 2026

View the case on the PEDW casework portal

What the inspector decided

The site is 2.34 hectares of greenfield land outside the settlement boundary, on the hillside above Llanfairfechan. The council's case was that, even if housing were justified, this was the wrong place: residents would face steep gradients, narrow pavements and a stretch of Mount Road with no footway at all.

The inspector did not dismiss those concerns. The decision accepts that the gradients and the missing footway would make walking and cycling harder for some people (paragraph 9). But the town had shops, schools, medical facilities, a library and bus and rail links, and both walking routes to the centre took under 15 minutes. On the site visit, the inspector saw people of varying ages using them (paragraphs 8 and 11).

Traffic on the approach was light and slow. The traffic statement forecast fewer than 20 peak-hour movements and the highway authority did not object. The development would not be wholly reliant on the car (paragraph 12). The site was accessible for most users, consistent with Planning Policy Wales, TAN 18 and the local plan (paragraph 14).

The scheme still conflicted with the countryside policies, because it was outside the settlement boundary. But Conwy had a housing shortfall the council itself put at 2,813 homes, about 40% behind its plan. With 30% affordable housing and a deliverable site, the benefits carried significant weight and the appeal was allowed (paragraphs 18 to 22 and 30).

Accessibility is relative

The heart of the decision is paragraph 10. TAN 18 asks decision-makers to maximise relative accessibility. It does not require that every resident can reach every service comfortably on foot. The inspector also drew on the 20-minute walkable neighbourhood benchmark in the active travel guidance, and the routes here came in under 15 minutes.

That framing alters the question. It is no longer whether the walk is easy for everyone, but whether this location is a reasonable one when compared with the alternatives. In a hilly coastal town, almost every site involves some climbing. A standard that penalised gradients outright would rule out much of the town.

It also matters who does the walking in practice. The inspector relied not only on distances, but on seeing the routes in use. Such evidence is readily obtainable and, in this case, was evidently persuasive.

Set beside Nesscliffe

Ten weeks later, an inspector in England dismissed a 26-home scheme at Nesscliffe in Shropshire, in part because the walk to the village had no continuous footway. At first sight the decisions appear inconsistent. On closer examination, they can be reconciled.

  • How much of the route lacked a footway. At Nesscliffe, residents would walk on a narrow, unlit road for most of the distance. At Llanfairfechan, the gap was a stretch of one route, with an alternative available.
  • What the traffic was like. Llanfairfechan had light, slow-moving traffic. The Nesscliffe decision focused on a road with limited verges and no lighting, where warning signs were judged inadequate.
  • What sat at the other end. Llanfairfechan is a town with rail, bus, schools and health services. Nesscliffe is a village hub with a smaller set of facilities.
  • What the inspector saw. People of all ages were walking the Llanfairfechan routes. Nothing in the Nesscliffe decision suggests the same.

The distinction does not lie in the different policy regimes. It is the quality and extent of the route, and what it leads to. The Welsh policy language makes the relative test explicit, but an English inspector asking whether access is safe and suitable for all users would reach a similar answer on the Llanfairfechan facts.

Points of doubt

A careful reader may pause at two points. First, Planning Policy Wales places walking and cycling at the top of the sustainable transport hierarchy and expects new development to be designed around them. A council could fairly argue that "most users" leaves out exactly the people that hierarchy is meant to protect, such as older residents and parents with pushchairs on steep hills.

Second, the decision finds conflict with several local plan policies on location, yet concludes that the scheme accords with the plan as a whole once the housing shortfall and affordable housing are weighed. The housing evidence was strong and largely undisputed, so the outcome is unsurprising. But it shows how much the transport finding mattered: had the site been found inaccessible, the locational conflict would have been far harder to overcome.

What to take into a Welsh scheme

  • Frame the case in Welsh policy terms. Frame the case around PPW, TAN 18 and the sustainable transport hierarchy.
  • Measure time, not just distance. Walking times to key services, set against the 20-minute benchmark, are easier to judge than straight-line distances, especially on hills.
  • Acknowledge the limitations of the routes. The inspector accepted the gradients and missing footway as real. Acknowledging them, and showing alternatives, is more credible than denying them.
  • Show the routes in use. Pedestrian counts or observations on the actual routes give the inspector something concrete.
  • Offer targeted improvements. Dropped kerbs and active travel conditions were part of the package here. Small works on the right route can carry real weight.
  • Compare with the alternatives. Relative accessibility invites a comparison. Show why this site performs as well as, or better than, the realistic alternatives in the settlement.

Decision notice and references

  1. PEDW appeal decision CAS-04497-C7C2W2, 11 Gorwel, Llanfairfechan (Planning and Environment Decisions Wales casework portal)Main issues: paragraph 4. Accessibility, gradients and TAN 18: paragraphs 6 to 14. Countryside policy conflict: paragraphs 15 to 17. Housing supply: paragraphs 18 to 22. Planning balance: paragraphs 29 to 31. A copy of the decision is also published by Landmark Chambers.
  2. Our analysis of the Nesscliffe appeal (6005338)

Ripple was not involved in this appeal. Sources checked 21 October 2026. The project recommendations are our interpretation of the published decision. Each proposal needs assessment on its own facts.

Related services: Planning Policy Wales and TAN 18 · Transport planning in North Wales · Walking, wheeling and cycling.

Keep reading

Related decisions and guidance.

All insights