Transport and highways consultants in Bedford.
Transport and highways consultants providing Transport Statements, access and parking advice for sites across Bedford, from town centre conversions along the Great Ouse to larger housing and employment sites on the A421 and A6 corridors.
Bedford Borough Council
planning and highway authority
A421 and A1
run by National Highways
Planning and highways in Bedford
Bedford Borough Council decides planning applications in Bedford and is the highway authority for local roads, responding on access, parking and transport evidence. National Highways is responsible for the A421 and A1 and comments where a scheme would affect it.
Bedford Borough Council covers the town and the villages around it. Shortly to the south, beyond Wilstead and Cotton End, sites fall within Central Bedfordshire, where Central Bedfordshire Council is both planning and highway authority.
Development plan
The adopted plan is the Bedford Borough Local Plan 2030, adopted in 2020, read with the Allocations and Designations Plan of 2013 and saved policies from the 2002 local plan. The council withdrew its Local Plan 2040 from examination in October 2025 and has started work on a new Local Plan 2050, which is at an early consultation stage.
Highway authority standards we design to
- Parking Standards for Sustainable Communities: Design and Good Practice SPD: the borough's supplementary planning document setting car and cycle parking provision for new development and how it should be laid out.
- Highways Development Control Design Guide: the council's guidance on the geometry of new estate roads, accesses and junctions, which it is updating and reads alongside Manual for Streets and the Design Manual for Roads and Bridges.
- Traffic Calming: Streets for People: guidance on designing low-speed residential streets so that speeds are controlled by the layout.
- Waste and Recycling in New Developments: technical guidance on bin storage, collection points and the street layout needed for refuse vehicles.
- LTN 1/20 Cycle Infrastructure Design: the national cycle design guidance the council lists for new routes, crossings and site frontages.
These sit under the council's Local Transport Plan, with England's Economic Heartland setting the wider regional transport strategy for the Oxford to Cambridge area.
Checked 3 November 2026.
Transport in Bedford.
Roads around Bedford
Bedford is ringed by the A421 southern bypass, a dual carriageway that links M1 junction 13 to the west with the A1 at the Black Cat roundabout to the east. The A6 runs north towards Rushden and south towards Luton, the A428 heads west to Northampton and east towards St Neots, and the A600 and A603 serve Shefford and Sandy. Inside the town, the river crossings and the inner ring road concentrate traffic, so junction capacity near the centre often shapes the study area more than the bypass itself.
What we see in Bedford
Bedford sees town centre flats and changes of use, student and later living schemes, and housing on the northern and southern edges, with logistics and employment land drawn to the A421. Central schemes usually turn on parking provision, servicing on narrow streets and access to the station. On the edges, the questions are access onto the radial roads, cumulative effects on the bypass junctions and walking and cycling links back to the centre and the Embankment routes.
Rail, bus and active travel
Bedford station sits on the Midland Main Line, with Thameslink trains to London, Luton Airport, Gatwick and Brighton and East Midlands Railway services north and south. The Marston Vale line runs from Bedford towards Bletchley, and East West Rail proposals would link the town with Cambridge and Oxford. Local buses radiate from the bus station, and riverside paths give a largely flat cycling route through the centre.
Questions we get asked
Who decides planning and highways matters in Bedford?
Bedford Borough Council does both, as a unitary authority. National Highways is consulted where a scheme affects the A421 between the M1 and the A1, or the A1 itself.
Which local plan applies in Bedford now that the Local Plan 2040 has been withdrawn?
The Local Plan 2030, adopted in 2020, together with the 2013 Allocations and Designations Plan and saved 2002 policies. Work on a Local Plan 2050 has only just begun.
Will East West Rail affect a site near Bedford station?
It can. Land around the station and the route towards Cambridge is the subject of East West Rail proposals, so we check the latest safeguarding and design information before fixing an access or layout nearby.
What parking does Bedford Borough Council expect?
Its Parking Standards for Sustainable Communities SPD sets car and cycle parking and layout expectations. Lower car parking can be argued close to the station and town centre with good evidence on accessibility.
Also working around Bedford.
From our insights.
What does your Bedford site need?
Send us the location. We'll tell you what the council is likely to ask for, with a fixed fee.