Transport and highways consultants in Howden.
Transport and highways consultants providing Transport Statements, access and parking advice for sites in Howden, a minster town beside M62 junction 37 where a new relief road is being built to support housing and employment growth.
East Riding of Yorkshire Council
planning and highway authority
M62
run by National Highways
Planning and highways in Howden
East Riding of Yorkshire Council decides planning applications in Howden and is the highway authority for local roads, responding on access, parking and transport evidence. National Highways is responsible for the M62 and comments where a scheme would affect it.
Howden lies wholly within the East Riding of Yorkshire, where the council is both planning and highway authority. Goole, south across the Ouse, is also in the East Riding, but sites to the west towards Selby fall to North Yorkshire Council.
Development plan
The adopted plan is the East Riding Local Plan Update 2020 to 2039, whose Strategy and Allocations Documents were adopted on 2 April 2025 alongside the East Riding Design Code. With an up to date plan in place, most applications are judged directly against its policies.
Highway authority standards we design to
- East Riding Design Code SPD: adopted on 2 April 2025 with the Local Plan Update, and used in the technical assessment of new streets.
- Manual for Streets: the basis for residential streets offered for adoption.
- Design Manual for Roads and Bridges: applied to industrial estate roads and higher speed highway works, with road safety audits to GG 119.
- LTN 1/20 Cycle Infrastructure Design: used for new cycle routes and crossings.
These sit under the East Riding Local Transport Plan, with the Hull and East Yorkshire Combined Authority, established in 2025, preparing a longer term strategic transport plan.
Checked 3 November 2026.
Transport in Howden.
Roads around Howden
Howden is served by M62 junction 37, where the A614 runs north through the town towards Holme-on-Spalding-Moor and south over the Ouse at Boothferry Bridge. A relief road linking the A614 at Thorpe Road with Station Road is under construction to take heavy traffic away from the centre and open up land for up to 1,800 homes and the expansion of a large kitchen manufacturing site. Until it opens, routing through the narrow centre remains a key issue.
What we see in Howden
The East Riding Local Plan Update plans for significant growth at Howden alongside the relief road, with housing and employment land on the edges of the town. Smaller schemes include infill and conversions in the historic centre, where parking and servicing space is tight. For larger sites the questions are phasing against the relief road, the capacity of junction 37 and its approaches, and walking and cycling links from new estates to the town centre and station.
Rail, bus and active travel
Howden station lies north of the town on the Hull to Selby line, with Northern services and some longer distance trains towards Leeds, Manchester and London. The distance between the station and the centre is a recurring point in accessibility cases. Buses link Howden with Goole, Selby and surrounding villages, and the flat terrain makes cycling within the town straightforward.
Questions we get asked
Who decides applications in Howden and who gives the highways view?
East Riding of Yorkshire Council does both as a unitary authority. National Highways is consulted where a scheme affects the M62, including junction 37.
How does the Howden relief road affect new proposals?
Sites that depend on the new road may need their phasing or occupation tied to its opening. We agree with the council how traffic is assigned before and after the road is complete.
Is Howden station close enough to count for accessibility?
It is some distance from the centre, so we look at the actual walking and cycling routes, their lighting and footways, and present the station as one option alongside bus services.
What design standards apply to new estate roads in Howden?
Manual for Streets, read with the East Riding Design Code adopted in April 2025. Industrial estate roads follow the Design Manual for Roads and Bridges.
Also working around Howden.
From our insights.
What does your Howden site need?
Send us the location. We'll tell you what the council is likely to ask for, with a fixed fee.