National Highways traffic modelling guidance: agree it before you model.

National Highways has set out what it expects from traffic modelling where development affects motorways and trunk roads. What to agree at scoping, and what to submit.

Ripple Development PlanningPublished

Reported: · National Highways · Spatial Planning and Traffic Modelling: Guidance (holding document)

National Highways has published guidance on what it expects from traffic modelling where a development affects the strategic road network, the motorways and major A roads it manages. The guidance describes itself as a holding document and is undated. Trade press reported it on 30 July 2026, noting it had been added to the National Highways planning pages without an announcement.

Document: Spatial Planning and Traffic Modelling: Guidance

Publisher: National Highways, as a statutory consultee on the strategic road network

Status: A holding document, to be updated as policy develops. No date or version is given.

Applies to: Traffic modelling for development that affects the strategic road network in England

Read the guidance

What has changed

Until now, developers have relied on DfT Circular 01/2022, the Transport Analysis Guidance and case-by-case advice from each National Highways region. The new guidance gathers National Highways’ expectations for modelling in one place. It does not replace the Circular, and it says it is not meant to be prescriptive (Introduction).

Its stated aim is practical: to reduce the number of holding recommendations, and how long they stay in place. A holding recommendation is National Highways’ request that a council does not decide an application until an issue is resolved. Table 1 of the guidance lists the usual causes, from late changes to the scope to missing calibration files, and points to the section that deals with each.

The guidance covers traffic impact assessment on the strategic road network only. It says separate advice on Transport Assessments and Transport Statements will follow.

Engagement in four stages

Section 3 sets out four stages of engagement:

  1. Exploratory: the nature of the development, how it interacts with the strategic road network, known constraints, available data and whether modelling is likely.
  2. Scoping: the scope of the assessment, once the quantum, access and movement strategy are known.
  3. Scope confirmation: a recorded agreement on the modelling approach, surveys, scenarios, assumptions, outputs, timescales and how changes will be controlled.
  4. Review and resolution: a structured review of the models before the final Transport Assessment is submitted.

Applicants are asked to share a submission programme at each stage, and to involve the local highway authority, so that differing requirements are recorded and reconciled. Section 7 suggests an early Transport Scoping Note.

What to agree at scoping

Trip generation assumptions should be agreed during scoping (Section 3). For a small single-use site, trip rates may come from comparable sites. For larger or mixed-use sites, the guidance prefers a fuller approach that accounts for land use mix, accessibility, parking, internalisation and management measures.

Section 12 asks for a base year, an agreed opening year and further years set by phasing, aligned with Local Plan assumptions. Background growth, committed development and infrastructure delivery should be reflected, with cumulative impact tested. Whether a severe impact is possible should itself be considered at scoping, having regard to the location, the quantum, the trips on the strategic road network and how it already performs (Section 6).

The baseline evidence listed in Section 6 includes existing delay data, WebTRIS flows, STATS19 collision records and the existing layout, including active travel facilities.

Choosing a proportionate model

Section 10 asks for the type and extent of model to be discussed from the outset, and it ties the choice to the decision the model has to inform:

  • Junction models are for individual junctions or small networks.
  • Microsimulation is suggested where junctions interact, where queues could block back with safety or operational effects, where merges, diverges or weaving are central, or where simpler tools cannot answer the critical question.
  • Strategic models suit large schemes and significant rerouting. Variable demand modelling is an option where travel behaviour may change.

Existing approved models are generally supported, but pre-COVID base years should not be used except in the most exceptional circumstances (Section 9). Model extent should be proportionate, but long enough on external links to load all demand (Section 8).

Calibration, validation and survey periods

TAG Unit M3.1 is named as the reference for calibration and validation (Section 11). The guidance gives no numeric criteria of its own. Where targets are missed, the reasons and implications should be explained, and observed queues will not be given undue weight because they are less reliable.

On surveys, Section 8 recognises the traditional neutral months of April, May, June, September and October, but asks for neutral periods to be confirmed from long-term count data for the study area. Surveys taken outside them should be adjusted. Seasonality should be considered where peak month flows are around 20% above the annual average. Peak hours should reflect the most critical conditions rather than fixed time periods.

Vision-led planning and scenarios

Section 5 says assessments should not focus solely on accommodating forecast traffic demand. Section 6 asks for the plausibility of any movement strategy to be tested, including how far it relies on the strategic road network. Scenarios can vary walking, cycling and public transport mode share, with higher and lower levels of uptake.

The guidance does not set mode share targets or default assumptions, and it does not use the term decide and provide. National Highways says it will help developers interpret current and future vision-led guidance.

Points to note

  • Holding document: the guidance will be updated, so the version used should be recorded in the scoping note.
  • Severe: the test is that development does not result in severe residual impacts on the safety or performance of the strategic road network, citing paragraph 51 of Circular 01/2022 (Sections 2 and 6). The guidance does not define severe.
  • Response times: none are given beyond statutory requirements (Section 5). All parties are asked to keep a comments and change tracker.
  • Submission: Section 13 lists the files expected, including all model files, raw survey data, calibration and validation analysis, signal timings, forecast calculations and a model variability test.

Practical points

Our advice, not part of the guidance.

  • Write the scope down. A short scoping note that records trip rates, distribution, assessment years, committed development and scenarios gives everyone the same reference point when the review begins.
  • Check the neutral period first. Look at long-term WebTRIS data before booking surveys, rather than relying on the calendar.
  • Match the model to the question. A junction model may be enough for a small scheme, provided blocking back and merges are not in play.
  • Plan the sustainable travel scenarios. Where the case rests on lower car use, agree the higher and lower uptake tests at scoping.
  • Send the files with the report. Missing calibration files and unclear assumptions are listed as common causes of delay.

Sources

  1. National Highways, Spatial Planning and Traffic Modelling: GuidanceEngagement: Section 3. Vision-led: Sections 5 and 6. Neutral periods and model extent: Section 8. Existing models: Section 9. Model choice: Section 10. Calibration and validation: Section 11. Assessment years: Section 12. Submission: Section 13.
  2. DfT Circular 01/2022, The strategic road network and the delivery of sustainable developmentParagraph 51, cited in the guidance.

Sources checked 18 November 2026. The practical points are our interpretation of the guidance, not legal advice. Each proposal needs assessment on its own facts.

Related services: Junction modelling · Transport Assessments · Transport scoping.

One useful email a month

Appeal decisions, policy changes and practical guidance on transport and planning, explained plainly. Unsubscribe at any time.

Keep reading

Related decisions and guidance.

All insights