Transport planning · Cheltenham

Transport and highways consultants in Cheltenham.

Transport and highways consultants providing Transport Statements, parking and access advice and responses to highways comments for development across Cheltenham, from town centre conversions to the large allocations around M5 junctions 10 and 11.

Cheltenham Borough Council

decides planning applications

Gloucestershire County Council

highway authority for local roads

M5

run by National Highways

Who decides

Planning and highways in Cheltenham

Cheltenham Borough Council decides planning applications in Cheltenham. Gloucestershire County Council is the highway authority for local roads and is consulted on access, parking and transport evidence. National Highways is responsible for the M5 and comments where a scheme would affect it.

The town’s north-western and western fringes, including parts of the large strategic allocations, lie in Tewkesbury Borough rather than Cheltenham Borough, so the planning authority can change within a short distance. The county council answers on highways for both boroughs.

Development plan

Decisions are made against the Joint Core Strategy (December 2017), shared with Gloucester and Tewkesbury, and the Cheltenham Plan adopted in 2020. A replacement Strategic and Local Plan prepared by the three councils is programmed for final draft consultation before the end of 2026 and submission by 31 March 2027.

Highway authority standards we design to

  • Manual for Gloucestershire Streets: the county’s street design guidance, published in July 2020 with an October 2021 addendum, building on Manual for Streets and Manual for Streets 2 with street types, design speeds and visibility criteria.
  • Pre-application engagement and appraisal requirements: the part of the Manual that sets thresholds for Transport Statements and Transport Assessments, the other triggers such as 30 or more two-way vehicle movements in an hour, and when a travel plan is expected.
  • Provision for parking: the Manual’s parking chapter, covering visitor parking, car clubs and car-free or reduced parking, read alongside the parking policies in each district’s local plan.
  • Traffic Signal Design Guide and Signals Specification: updated in May 2026 and applied where a development proposes new or altered signal-controlled junctions or crossings.

These sit under Gloucestershire’s Local Transport Plan 2020 to 2041, adopted in 2021, which is being replaced: consultation on the draft new Local Transport Plan runs until 15 November 2026.

In July 2026 the Government decided to replace Gloucestershire’s county and district councils with a single unitary council, but that decision was paused in September 2026 and withdrawn in October. The Government is now minded to confirm a single unitary, with elections in May 2028 and the new council taking over in April 2029; until then the district councils decide planning applications and the county council remains the highway authority. Checked 3 November 2026.

Local knowledge

Transport in Cheltenham.

Roads around Cheltenham

Cheltenham is served by M5 junction 11 via the A40 Golden Valley bypass and by junction 10 via the A4019 Tewkesbury Road. Junction 10 currently has only partial movements; an all-movements upgrade with a new link road to the B4634 and widening of the A4019 received development consent in June 2025, and with main works approved in June 2026 it is due for completion in spring 2029. The A40, A46 and A435 radiate from an inner ring road, and the Arle Court junction at the western edge is a key pinch point.

What we see in Cheltenham

In the centre we see many changes of use, flats in Regency buildings and student or older people’s housing, where parking, servicing and refuse collection are the usual issues. On the edges, strategic sites such as the West Cheltenham Golden Valley development and North West Cheltenham bring questions of junction capacity, bus access and how the new M5 junction 10 arrangements are reflected in the evidence. Race meetings create their own peaks.

Rail, bus and active travel

Trains from Cheltenham Spa are run by Great Western Railway, CrossCountry and Transport for Wales, reaching London, Birmingham, Bristol and Cardiff without a change. A frequent bus corridor links the town with Gloucester, and the Arle Court park and ride, being redeveloped as a transport hub, serves the west. Cycle routes along the A40 and through the town centre are being extended, and the county will look for links from new sites to these.

FAQ

Questions we get asked

Who decides an application in Cheltenham and who comments on highways?

Cheltenham Borough Council decides it, or Tewkesbury Borough Council for sites on the town’s north-western and western edges. Gloucestershire County Council gives the highways response, and National Highways comments where the M5 is affected.

How should an assessment treat the M5 junction 10 scheme?

Construction is due to run to spring 2029. We agree with the county and National Highways whether to assess the current layout, the improved junction or both, depending on when the development would be occupied.

Can a town centre conversion in Cheltenham have little or no parking?

Often, where the location is highly accessible and parking controls are in place. We provide evidence on on-street parking, bus and rail access and cycle storage to support that case.

Do race meetings affect a Transport Assessment?

Usually only for sites near the racecourse or on its approach roads. Assessments normally use typical weekday peaks, but we discuss event traffic with the county where it matters.

Nearby

Also working around Cheltenham.

All of Gloucestershire, Wiltshire and Swindon
Further reading

From our insights.

All insights

What does your Cheltenham site need?

Send us the location. We'll tell you what the council is likely to ask for, with a fixed fee.