Transport and highways consultants in Gloucester.
Transport and highways consultants providing Transport Statements, parking and access advice and responses to highways comments for development across Gloucester, from city centre regeneration to urban extensions near M5 junctions 11, 11A and 12.
Gloucester City Council
decides planning applications
Gloucestershire County Council
highway authority for local roads
M5
run by National Highways
Planning and highways in Gloucester
Gloucester City Council decides planning applications in Gloucester. Gloucestershire County Council is the highway authority for local roads and is consulted on access, parking and transport evidence. National Highways is responsible for the M5 and comments where a scheme would affect it.
Much of Gloucester’s growth sits just outside the city boundary in Tewkesbury Borough to the north and east and Stroud District to the south, so the planning authority can change across a single road. Highway advice comes from Gloucestershire County Council wherever the line falls.
Development plan
The adopted plan comprises the Joint Core Strategy of December 2017 and the Gloucester City Plan 2011 to 2031, adopted in January 2023. Both will be replaced by the Strategic and Local Plan being prepared with Cheltenham and Tewkesbury, which the councils aim to submit for examination by 31 March 2027.
Highway authority standards we design to
- Manual for Gloucestershire Streets: the county’s street design guidance, published in July 2020 with an October 2021 addendum, building on Manual for Streets and Manual for Streets 2 with street types, design speeds and visibility criteria.
- Pre-application engagement and appraisal requirements: the part of the Manual that sets thresholds for Transport Statements and Transport Assessments, the other triggers such as 30 or more two-way vehicle movements in an hour, and when a travel plan is expected.
- Provision for parking: the Manual’s parking chapter, covering visitor parking, car clubs and car-free or reduced parking, read alongside the parking policies in each district’s local plan.
- Traffic Signal Design Guide and Signals Specification: updated in May 2026 and applied where a development proposes new or altered signal-controlled junctions or crossings.
These sit under Gloucestershire’s Local Transport Plan 2020 to 2041, adopted in 2021, which is being replaced: consultation on the draft new Local Transport Plan runs until 15 November 2026.
In July 2026 the Government decided to replace Gloucestershire’s county and district councils with a single unitary council, but that decision was paused in September 2026 and withdrawn in October. The Government is now minded to confirm a single unitary, with elections in May 2028 and the new council taking over in April 2029; until then the district councils decide planning applications and the county council remains the highway authority. Checked 3 November 2026.
Transport in Gloucester.
Roads around Gloucester
Gloucester has three M5 junctions: 11 via the A40 towards Cheltenham, 11A via the A417 and 12 via the A38 to the south. The A40, A417, A38 and A430 form a ring of radial and bypass routes around the city, with the A40 north-western bypass linking to Over and the Forest of Dean. Junction capacity on these routes, especially at the main roundabouts on the A40 and A38 and around the Quays, is often the core question in any assessment.
What we see in Gloucester
Regeneration of the city centre, the Docks and Kings Quarter has brought flats, student housing, leisure and commercial uses. The edges have seen urban extensions, including Kingsway at Quedgeley and the Joint Core Strategy allocations at Innsworth and Twigworth. Typical issues include servicing in the centre, low or no parking for city centre flats, and the cumulative effect of edge sites on the M5 junctions.
Rail, bus and active travel
Great Western Railway, CrossCountry and Transport for Wales all call at Gloucester, giving through trains to London, Bristol, Birmingham and Cardiff. The transport hub beside the station area is the main bus interchange, with frequent routes to Cheltenham, Stroud and the Forest of Dean. Cycle routes follow the Gloucester and Sharpness Canal towpath and the A40 and A38 corridors.
Questions we get asked
Who decides planning applications in Gloucester?
Gloucester City Council decides applications within the city. For many fringe sites, Tewkesbury Borough Council or Stroud District Council is the planning authority. Gloucestershire County Council is the highway authority in every case.
Can city centre flats in Gloucester be car free?
Often, where the site is close to the station and bus hub and parking controls are in place. We provide accessibility and parking evidence to support that approach.
Will National Highways comment on a Gloucester scheme?
Where it adds enough traffic to M5 junctions 11, 11A or 12. The trip forecast at scoping shows whether that is likely, and the assessment method is then settled with National Highways and the county.
How will the Strategic and Local Plan affect sites in Gloucester?
It will replace the Joint Core Strategy and the Gloucester City Plan. The councils aim to submit it for examination by 31 March 2027, so its policies carry limited weight for now.
Also working around Gloucester.
From our insights.
What does your Gloucester site need?
Send us the location. We'll tell you what the council is likely to ask for, with a fixed fee.